Saturday, February 20, 2010

Roadbed Complete


The last of my Homabed arrived and I was able to complete the last of the roadbed. The last section of roadbed is now down.




Now it is time to start laying track. I am using the 8'6" ties strips from central valley and micro engineering code 83 unweathered rail. All switches are built by me using my fast tracks jigs.



Above is the first portion of my layout with track on it. You can see the first installed turnout in the upper right of the photo. My plan is to build track between the turnouts as I make and install them.

I plan on making a step-by-step on how I am installing my track soon.

Chris


No comments:

Post a Comment